Natural Resources and Environment - Better Planning Can Reduce Size of Wastewater Treatment Facilities, Saving Millions in Construction Costs: Ced-82-8 (Paperback)


GAO conducted a review to evaluate the effectiveness of the facility planning process for constructing wastewater treatment plants and to determine whether changed conditions, such as increases or decreases in population projections or industrial flow for proposed service areas, were recognized and incorporated into the facility plans before the plant was designed or before construction started. GAO estimated that about $30 million in grant funds could be saved if the Environmental Protection Agency's (EPA) 1978 facility planning regulations were applied to the 13 facility plans reviewed by GAO. These facilities were developed under pre-1978 regulations, but are not yet under construction. Current regulations limit the engineering judgment in calculating domestic and industrial flow allowances. However, under the 1978 regulations, EPA stipulated that state population projections would be the sole basis for estimating future population levels to be served by a proposed treatment system. If the 1978 regulations were applied, 11 of those 13 proposed plants would be smaller and 2 plants would be larger. The Municipal Wastewater Treatment Construction Grant Amendments of 1981 provide that no federal grant will be made to construct treatment works which provide reserve capacity in excess of the needs which existed on the date of grant approval. In addition, the amendments reduce federal participation from 75 to 55 percent of the construction costs. Many facets of facility planning are not covered by guidance or regulation. As a result, engineering judgment, which varies considerably from project to project, becomes the deciding factor in determining plant size and project cost. Additional criteria are needed to assist in the determination of proper plant size and to provide plan reviewers a basis on which to evaluate the adequacy of a plan.

R317
List Price R396
Save R79 20%

Or split into 4x interest-free payments of 25% on orders over R50
Learn more

Discovery Miles3170
Delivery AdviceOut of stock

Toggle WishListAdd to wish list
Review this Item

Product Description

GAO conducted a review to evaluate the effectiveness of the facility planning process for constructing wastewater treatment plants and to determine whether changed conditions, such as increases or decreases in population projections or industrial flow for proposed service areas, were recognized and incorporated into the facility plans before the plant was designed or before construction started. GAO estimated that about $30 million in grant funds could be saved if the Environmental Protection Agency's (EPA) 1978 facility planning regulations were applied to the 13 facility plans reviewed by GAO. These facilities were developed under pre-1978 regulations, but are not yet under construction. Current regulations limit the engineering judgment in calculating domestic and industrial flow allowances. However, under the 1978 regulations, EPA stipulated that state population projections would be the sole basis for estimating future population levels to be served by a proposed treatment system. If the 1978 regulations were applied, 11 of those 13 proposed plants would be smaller and 2 plants would be larger. The Municipal Wastewater Treatment Construction Grant Amendments of 1981 provide that no federal grant will be made to construct treatment works which provide reserve capacity in excess of the needs which existed on the date of grant approval. In addition, the amendments reduce federal participation from 75 to 55 percent of the construction costs. Many facets of facility planning are not covered by guidance or regulation. As a result, engineering judgment, which varies considerably from project to project, becomes the deciding factor in determining plant size and project cost. Additional criteria are needed to assist in the determination of proper plant size and to provide plan reviewers a basis on which to evaluate the adequacy of a plan.

Customer Reviews

No reviews or ratings yet - be the first to create one!

Product Details

General

Imprint

Bibliogov

Country of origin

United States

Release date

July 2013

Availability

Supplier out of stock. If you add this item to your wish list we will let you know when it becomes available.

First published

July 2013

Creators

,

Dimensions

246 x 189 x 3mm (L x W x T)

Format

Paperback - Trade

Pages

52

ISBN-13

978-1-289-15147-8

Barcode

9781289151478

Categories

LSN

1-289-15147-4



Trending On Loot